Commissioning / Product Installation & Service Documentation - Heatrae Sadia HI-MAX INSTANT ID 5-60 Installation, Operation And Maintenance Manual

Indirect hiu
Table of Contents

Advertisement

14. Commissioning / product installation & service documentation
HEAT INTERFACE UNIT COMMISSIONING CHECKLIST
This commissioning checklist is to be completed in full by the competent person who commissioned the HIU as
a means of demonstrating how the unit was installed and commissioned and must be handed to the customer
to keep for future reference.
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark
Commissioning Checklist may invalidate the warranty. This does not affect the customer's statutory rights.
Customer name:
Address:
HIU Make and Model:
HIU Serial Number:
Commissioned by (PRINT NAME):
Company name:
Company address:
Installer name:
Installer contact telephone number:
Building Regulations Notifi cation Number (if applicable)
HIU TYPE
1. Hot water only. (1 DHW PHE no Heating controls).
2. Direct Apartment Heating Unit (1 DHW PHE with Apartment Heating Controls).
3. Indirect Apartment Heating Unit (1 DHW PHE and 1 Apartment Heating PHE with Controls).
4. Heat Only (Direct) (No plate heat exchanger just Heating Controls).
5. Heat Only (Indirect) (1 Apartment heating plate heat exchanger with Heating Controls).
6. HIU with integral cylinder.
7. HIU to be connected to a cylinder.
NOTE: If connecting HIU to an external cylinder, have you checked compatibility?
DISTRICT SYSTEM (COMMUNITY HEATING SYSTEM)
Primary Control arrangement:
Balancing arrangements:
HIU Flow Regulation:
Differential pressure across HIU: (if applicable)
Static District pressure: (max system pressure)
District fl ow temperature:
Flow control valve setting: (if applicable)
Flow control valve type: (if external)
Make:
Size:
Primary pressure system breaks:
Flushing bypass fi tted and closed:
Dwelling isolation valves fi tted:
If 'Yes' where:
Strainer checked and cleaned if necessary:
* All installations in England and Wales must be notifi ed to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certifi cate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
52
Telephone number:
Email:
Registered Operative ID number:
Telephone number:
Email:
Commissioning date:
Installation company:
Control Valve within HIU
Pressure Independent
On/Off
Model:
Type:
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Control Valve outside HIU
Differential Pressure
Modulating
kPa
bar (g)
°C
Yes
Yes
Yes
Yes
www.centralheating.co.uk

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hi-max instant id 5-80Hi-max instant id hiu

Table of Contents