INSTALLATION

Care must be taken when handling and connecting the boiler not to damage or stress it in any way. Prior to
installation the boiler must be stored in a dry, safe place.
The boiler must be mounted in an UPRIGHT position. The boiler must be fixed to a wall before connecting
pipework. When choosing the position for the boiler, ensure sufficient clearances to house the unit and for
servicing. 50mm minimum clearance each side of the boiler is required. A drain valve at the base of the
boiler is strongly recommended. It must be sited in a dry, ventilated position, frost free and not subjected to
extremes of temperature.
Note. Before connecting the pipework, ensure the rubber seal at the top of the boiler is firmly in place;
check it has not become loose in transit. The warranty will be invalid if water leaks into the boiler.
20mm
FIGURE TWO: DIMENSIONS
4
25.4mm
ENTRY PORTS
TOP HAUT ALTO OBEN
WARN ING
Before obtaining access to terminals all sup ply
circuits must be disconnected
SUPPLY AND
Do not so lder directly onto flow and return pipewor k
The guarantee will be withdrawn if this product is
Not ins talled in accordance with the installation
instructio ns
CONTROL ON
BOTH SIDES
Electroheat
AMPTEC
90mm
AMPTEC BOILER C600
GC NO. E B-205-02
OPERATING TEMPERATU RE
65-80C
PRESSURE
3 BAR MAX
220-240V ~
5-6KW
BEAB CE N CCA
COPYRIGHT RE SE RVED PATENT APPLIED
FOR
Electroheat
Basings to ke UK RG24 9 RA
BOTTOM
BA S
BASSO U NTEN
FLOW PIPEWORK
RED IDENT
RETURN PIPEWORK
BLUE IDENT
5mm SECURING
HOLE
30mm