Section 4

4.1 Placing instrument in operation

Commissioning
The sample pressure tube must never be clamped such that it is blocked off - the
pressure build up would either result in damage to the tubes or the tube connections
would spring off!!
After assembly has been completed, you can place FILTRAX in operation.
For this purpose
1. Clip pump cartridges into the control unit
2. Unpack the two filter modules and carefully slide into the module carrier!
As far as possible do not touch the delicate filter membrane!
3. Fit the two thicker sample tubes and the two thinner air tubes to tube fittings of
appropriate size as per the figure
4. Plug into the mains and set instrument parameters (sec. 5 Software menu
system)
N O T I C E
N O T I C E
30