Concrete Pulverizer Operating Tips - Labounty CP 80 Safety, Operation & Maintenance Manual

Concrete pulverizers
Table of Contents

Advertisement

CONCRETE PULVERIZERS

CONCRETE PULVERIZER OPERATING TIPS

1. To get the most crushing force from the pulverizer, pin the position arm in a mounting pad hole that allows
the guide link to travel beyond 90º to the bucket cylinder before crushing begins (see fi gure 4-3).
GUIDE LINK
2. When processing large, heavy materials, open and close with short cycles rather than attempt to crush
the material in one cycle (see fi gure 4-4). This allows the pulverizer to downsize the material until it is able to
pulverize it completely. This technique creates less stress on the attachment and excavator hydraulics.
Page 6 Section 4
Introduction to Safety
90º
FIGURE 4-3
FIGURE 4-4
RANGE OF GREATEST
PULVERIZING FORCE 90º
TO CLOSE
OPEN AND CLOSE ON
HEAVY MATERIAL

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CP 80 and is the answer not in the manual?

Table of Contents