Insert the composite cable in the first cable gland and separate
e
the multi-fibers cable from the copper wires. It is necessary to
remove the nut to perform this action. The cable must be fed
through the nut and it must be retightened once finished.
Bend the spliced fibers using the corner guides and fix the
f
splices to the splice holder.
Bend the optical cables as show in the picture to the right.
g
If a second splice holder is needed, it can be assembled using the
h
M4 insulating washer and two M4 plain washers, as shown to
the right. The required screw is a PTK30 x 12.
Mount the internal support Splice Box ION-U RU using three
i
PTK30 x 6 screws.
Remove the sealing nut and rubber of the cable gland and insert
j
the optical cables.
M0201AAC
© April 2018 CommScope, Inc.
ION®-E Series Low Power Carrier Access Point Installation Guide
Installing CAP Ls