Raypak XTherm 1005A Installation And Operation Manual page 33

Type h, wh, and p
Hide thumbs Also See for XTherm 1005A:
Table of Contents

Advertisement

3.18.1. Installation
These installations utilize the heater-mounted blower
to vent the combustion products to the outdoors.
Combustion air is taken from inside the room and the
vent is installed horizontally through the wall to the
outdoors. Adequate combustion and ventilation air must
be supplied to the equipment room in accordance with
the NFGC (U.S.) or B149 (Canada). The total length of the
horizontal through-the-wall flue system should not exceed
75 equivalent ft (23 m) in length. If horizontal run exceeds
75 equivalent ft (23 m), an appropriately-sized variable-
speed extractor must be used. Each elbow used is equal
to 10' (3 m) of straight pipe. This will allow installation in
one of the four following arrangements:
75' (23 m) of straight flue pipe
65' (20 m) of straight flue pipe and one elbow
55' (17 m) of straight flue pipe and two elbows
45' (14 m) of straight pipe and three elbows
The vent cap is not considered in the overall length of the
venting system.
The vent must be installed to prevent flue gas leakage.
Care must be taken during assembly to ensure that all
joints are sealed properly and are airtight. The vent must
be installed to prevent the potential accumulation of
condensate in the vent pipes. It is required that:
1. The vent must be installed with a condensate drain
located in proximity to the heater as directed by the
vent manufacturer.
2. The vent must be installed with a slight upward
slope of not less than 1/4" per foot of horizontal run
to the vent terminal.
3. The vent must be insulated through the length of the
horizontal run.
INSULATED EXHAUST
VENTING
HEATER
TEST PORT
12" MIN
(305 mm)
F10022
*
HOUSEKEEPING PAD
* See Figure 6 on page 8.
Figure 36. Horizontal Through-the-Wall Venting
12" MIN
(305 mm)
D-15 FLUE
EXHAUST
VENT CAP
12" MIN
(305 mm)
8.5" MIN
(215 mm)
CONDENSATE TRAP
HEATER
F10023
*
HOUSEKEEPING PAD
CONDENSATE TRAP
* See Figure 6 on page 8.
Figure 37. Alternate Horizontal Through-the-Wall Venting
ALTERNATE COMBUSTION
AIR INTAKE LOCATION
12" MIN
(305 mm)
COMBUSTION
HEATER
AIR INTAKE
TEST
PORT
F10024
*
HOUSEKEEPING PAD
CONDENSATE DRAIN
* See Figure 6 on page 8.
Figure 38. Horizontal Direct Venting
3.18.2. Termination
The Raypak sidewall vent termination (sales option D-15)
MUST be used and MUST be mounted on the exterior
of the building. The D-15 cannot be installed in a well or
below grade. The D-15 must be installed at least 1' (305
mm) above ground level and above normal snow levels.
INSULATED EXHAUST
VENTING
12" MIN
(305 mm)
12" MIN
D-15 FLUE
(305 mm)
EXHAUST
VENT CAP
8.5" MIN
12" MIN
(215 mm)
(305 mm)
TEST PORT
INSULATED
EXHAUST
VENTING
D-15 FLUE
EXHAUST
VENT CAP
12" MIN
(305 mm)
36" MIN
(914 mm)
6" MIN
(152 mm)
12" MIN
(305 mm)
12" MIN
8.5" MIN
(305 mm)
(215 mm)
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xtherm 1505aXtherm 2005a

Table of Contents