Download Print this page

American Standard 6047.800 Installation Instructions Manual page 4

Flush valve with bedpan washer for use with 1-1/2" top spud toilets

Advertisement

1
INSTALL TAILPIECE and DOWN
TUBE with VACUUM BREAKER;
Fig. 3
1. Slide the COUPLING NUT (3) onto the TAIPIECE
(4 or 4a). Place SEAL WASHER (2) with the tapered
side facing down into the COUPLING NUT (3).
2. Thread and tighten COUPLING NUT (3) to
DIVERTER ASSEMBLY (1).
3. Slide COUPLING NUT (3a) onto the DOWN TUBE
(5). Place SEAL WASHER (2a) with the tapered side
facing up into the COUPLING NUT (3a).
4. Thread and tighten COUPLING NUT (3a) to
DIVERTER ASSEMBLY (1).
INSTALL SPUD FLANGE
2
COUPLING; Fig. 4
1. Place the SPUD FLANGE (1) over the spud on
the Fixture.
2. Thread SPUD COUPLING NUT (2) onto Spud. Make
sure SEAL WASHER (3) and FRICTION WASHER
(4) are installed. Do not tighten fully.
Fig. 3
3a
TAPERED
SIDE UP
2a
2
TAPERED SIDE
DOWN
1-1/2" OFF-SET
TAILPIECE
Fig. 4
2
1
3
5
1
4a
OR
3
4
1-1/2" TOP SPUD
M965403 REV. 1.1
2
3
4

Advertisement

loading

This manual is also suitable for:

6047.8156047.8206047.860