BKI FKM-TC Series Operation Manual page 44

Extra-large electric pressure fryer series with training central
Table of Contents

Advertisement

Electric Pressure Fryer
14. The display will count up the time the pump is on to indicate the duration of refilling of the pot. Let the
filter continue to pump the shortening until air starts bubbling through the shortening. When done
press the Off button to stop the pump and press the right arrow button.
15. Add new shortening if the fill mark has not been reached.
42
Maintenance

Advertisement

Table of Contents
loading

Table of Contents