Page 1
Original instructions AVANTI SERVICE LIFT Installation and Maintenance Manual Model Service Lift OCTOPUS L80 AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 1 10/17/2018 11:08:27 AM...
Page 2
AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 2 10/17/2018 11:08:27 AM...
Page 3
P: +45 4824 9024 F: +45 4824 9124 E: info@avanti-online.com I: www.avanti-online.com Sales & Service: Australia Avanti Wind Systems PTY LTD P: +61 (0) 3 9585 1852 China Avanti Wind Systems P: +86 21 5785 8811 Denmark Avanti Wind Systems A/S...
THE MAXIMUM EXTENT PERMITTED BY the entire liability of Avanti under this limited APPLICABLE LAW AND ARE EXPRESSLY warranty, shall be, at the option of Avanti, a DISCLAIMED BY AVANTI. IF, PURSUANT TO ANY replacement of the Product (including incidental...
Please check Avanti website/manuals for the latest revisions of the manuals. Any additional cost related to or arising from any changes in the manuals does not entitle Customer to any form of compensation or other legal remedies.
2.4 Terms and definitions Terms Definitions Person who has gone through the relevant training associated with the scheduled task from Avanti or from Certified technician a certified trainer and is in possession of a valid (non expired) certificate for the task.
Depending of travel path, dimension may need to be larger in order to avoid collisions of travelling cable pulley with platforms. Other dimensions are possible upon request and design verification by AVANTI. In case of single rung brackets: 2240 mm. between the centers of brackets.
3.2 Cautions 4. Attach coiled wire ropes to top beam by means of cable strips to prevent them from moving Prior to installation, ensure that: during transport of tower section. • Building sections involved will be able to withstand 5. Position service lift on ladder at bottom platform, the service lift loads.
4. Feed through guide bushing of travelling cable pulley. 5. Feed through the platform hole. Traction Safety wire 6. Feed the wire rope through the compression spring. wire rope rope AVANTI Service Lift for Wind Turbines AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 10 10/17/2018 11:08:28 AM...
3.9 Safe zone plates and top limit plate Adjust the final position of the safe zone plate on each platform, so that the service lift floor is levelled with the platform floor when it stops. Adjust the final position of the top limit plate so that the service lift floor is levelled with the top platform floor when it stops.
Certified Technician (whatever occurs first) Every 20 years or 250 hours of Traction hoist operation (whatever occurs first) At Avanti Workshop Fall arrest device Note: Optional feature. AVANTI Service Lift for Wind Turbines AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 12...
125 hours of operation Fall arrest device (whatever occurs first) Every 20 years or 250 hours of Traction hoist operation (whatever occurs first) At Avanti Workshop Fall arrest device Note: Optional feature. 4.3 Cautions Before any maintenance task, ensure that walking •...
1. A first person ascends in the service lift several 3. When inspecting the wire ropes, consider the meters so that the wire ropes are accessible following points: from the platform. AVANTI Service Lift for Wind Turbines AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 14 10/17/2018 11:08:29 AM...
Page 15
5. Repeat steps 1 to 4 on each platform until the entire length of the wire ropes is lubricated. AVANTI recommends to replace the traction 6. Perform two complete ascends and descends and safety wire ropes after 250 hours of...
• Amount required: 1,5 l • Traction hoist: M508 • Oil: Mobil SHC 632. Each oil has to be verified by AVANTI. 4.6 Ordering spare parts Only use original parts. Spare part lists are available from AVANTI. Please indicate lift model when requesting a spare part list.
Regulation of overload limiter Verification and/or adjustment of the overload device on the service lift can only be done by a certified technician, who must have been instructed by AVANTI to perform this task. Avoid injury by strictly following the...
1. The overload limiter is correctly set! 2. Fill in the “Appendix: Inspection log sheet” AVANTI Service Lift for Wind Turbines AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 18 10/17/2018 11:08:29 AM...
D.2 Danger The AVANTI LIFT ANCHOR is for the use of one If there are any doubts to the safety of the AVANTI person only. It is strictly forbidden to carry out work LIFT ANCHOR, or it isn’t proper fixed, deform or if the person is in unfit mental or physical condition.
Page 20
AVANTI LIFT ANCHOR is tested and approved only below. to be installed on AVANTI lift. AVANTI LIFT ANCHOR 2. Torque the nuts with 15 N·m (11 lb·ft). made from AISI 304 Steel has to be screwed with 3.
Page 21
Date: If the AVANTI LIFT ANCHOR is found not OK, it must be removed / replaced by a new AVANTI LIFT ANCHOR! The result of the periodic examination must be recorded in the Registration form of anchor. Maintenance and Installation Manual AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 25...
Page 22
Maintenance and Installation Manual AT00014736_Octopus L80 Installation manual EN E1R3 NON CE.indd 27 10/17/2018 11:08:30 AM...
Need help?
Do you have a question about the OCTOPUS L80 and is the answer not in the manual?
Questions and answers