Startup Check List - Daikin OptiLine FSG Installation, Operation And Maintenance Manual

Vertical stack fan coil
Table of Contents

Advertisement

Receiving & Inspection
… Unit received undamaged
… Unit received as ordered
Handling & Installation
… Unit installed level & square
… Proper access is provided
… Proper over-current protection is provided
… Unit protected from dirt & foreign matter
Cooling/heating Connections
… Protect valve package components from excessive heat
… Pressure test all piping for leaks
… Install drain lines and traps as required
… Insulate all piping as required
… Connect risers from master to secondary units if required
… Connect risers to piping package if shipped separately or
supplied by others
Electrical Connections
… Refer to unit wiring diagram
… Connect incoming power service
… Install and connect "shipped lose" components like
thermostat
www.DaikinApplied.com
Unit Start-up
… Check for free and proper fan rotation
… Record electrical supply voltage and amperage
… Check all wiring for secure connections
… Close all unit isolation valves
… Flush water systems
… Open all isolation valves after system flush
… Check that Erie control valve is not in the "locked" open
position.
… Vent water systems as required
… All duct work and grills are in place
… Filters are in place
… Start blowers, pumps, chillers etc
… Check all units for electrical over-load
… Check all duct work and units for air leaks
… Balance water systems as required
… The Erie control valve can be "locked" open by manually
positioning the lever on the back of the valve actuator.
Ensure this released so after flushing to allow the valve to
be controlled by the thermostat
… Balance air system as required
… Record all final settings for future reference
… Check piping and walls for severe vibration
… Check all dampers for proper operation (if any)
… Verify heating and cooling operation
… Ensure all access panels and grilles are securely 1 in
place
… Verify condensate is flowing
11
IM 1272 • OPTILINE VERTICAL FAN COILS

Startup Check List

Startup Check List

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OptiLine FSG and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents