Changing The Tube Set (T Set) - wtw P 700 IQ Operating Manual

Measuring system for online determination of orthophoshate in aqueous samples
Hide thumbs Also See for P 700 IQ:
Table of Contents

Advertisement

P 700 IQ
Lower ventilation grid
ba75998e05
03/2015
Fig. 5-7: Exchanging the upper filter mat
1 Ventilation grid
2 Filter mat
3 Opening for screwdriver
4
Close the ventilation grid.
5
Fold the bearer and close the housing lid.
6
Screw the housing lid tight with the two screws.
7
Position yourself under the analyzer housing.
8
Open the ventilation grid and exchange the filter mat as for the
upper ventilation grid.
Fig. 5-8: Exchanging the lower filter mat
1 Ventilation grid
2 Filter mat
9
Close the ventilation grid.
5.4.4

Changing the tube set (T SET)

The tubes of the P700IQ-PO4 should be exchanged yearly.
The tube set (T SET) contains the following tubes:
Maintenance and cleaning
1
2
3
81

Advertisement

Table of Contents
loading

Table of Contents