Commissioning
Main steps
24

3.3.2 General installation instructions

This section describes the installation of the P 700 IQ with
various especially designed accessories. We assume that
the operator uses these accessories. In this section, the
individual scopes of delivery are not distinguished so the
comprehensibility of the instructions is not affected.
Pay attention to the following points during installation:
 Installation in the open should be carried out while the weather is
frost-free.
 Due to its weight, the analyzer always has to be carried by two
people (housing door upward, both people grasp the housing at the
upper C rail and at the housing bottom on the side of the door).
 The analyzer may only be fastened to a wall or fixture with the aid of
the two rails (housing upright).
Installation of the P 700 IQ includes the following main steps:
1

Installing the housing.

See section 3.3.3,  24.
2
Installing the FM filter membrane module and the M 1.5 attach-
ment for filtration.
See section 3.3.4,  35.
3
Inserting the connections into the housing.
See section 3.3.5,  36.
4
Connecting the IQ S
See section 3.3.6.1,  39.
5
Connecting the power line and heat tracing lines.
See section 3.3.6.2,  41.
6
Connecting the liquid containers.
See section 3.3.6.3,  43.
3.3.3 Installing the housing
The housing of the P 700 IQ can be installed in the following ways:
 On the SM stand mount. See section 3.3.3.1 Installation on the SM
stand mount,  25.
 On a rail. See section 3.3.3.2 Installation on a rail,  30.
N
cable to the MIQ//WCA 232.
ENSOR
ET
P 700 IQ
ba75998e05
03/2015