Installation
Checking for leaks
Conducting trial run
Commissioning
following extended
stoppages
Page 36
3.5
WARNING: Risk of injury!
In case of leakages in the oil circuit there is a certain danger to slip and fall
because of oil spills!
Have all connections of the oil circuit checked for leakages by authorized
qualified personnel!
During the inspection slip-resistant safety shoes and protective clothing are
obligatory!
Undertake the following to prevent leaks:
–
Check screw connection of the lines and retighten, if necessary.
–
Check to ensure that the oil filter and oil separator are hand tight seated.
Close mains disconnecting device.
–
Switch on the compressor using the ON key. The compressor starts.
–
When the factory-set switch-off pressure is reached, the compressor cuts
off automatically.
–
Check network pressure on control display.
If necessary, reset operating pressure (pressure target value).
–
The compressor is ready for operation.
Switch off the compressor after a trial run of several hours under maximum
load.
List up the test results in the commissioning certificate.
If an extended stoppage is scheduled, you should contact BOGE-Service be-
forehand.
Following an extended stoppage of more than two months, fill a small amount
of oil in the suction controller prior to starting the compressor.
WARNING!
Only fill the suction controller with the grade of oil used to operate the com-
pressor.
Never mix different oil grades and brands.
WARNING: Risk of injury!
Prior to any maintenance and servicing work take all necessary safety pre-
cautions as described on page 5.
Commissioning
BOGE Operating instructions for C 15 series screw compressors