General; Tests Before Taking Into Operation - Bomag BW 100 AD-4 Operating Instructions Manual

Tandem vibratory roller, combination roller
Table of Contents

Advertisement

Operation

5.1 General

If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter "Indicators
and control elements" before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
46
5.2 Tests before taking into op-
eration
Before the everyday use or before a longer work-
ing period the following tests and inspections must
be performed.
Danger
!
Please observe strictly the safety regulations
in the corresponding section of this instruc-
tion manual!
Park the machine on ground as level as possi-
l
ble.
Check:
fuel tank and fuel lines for leaks
l
Screw connections
l
function of steering
l
function of emergency stop
l
function of parking brake
l
machine for cleanliness, damage
l
presence of the appropriate operating and
l
maintenance instructions
proper maintenance of the machine
l
i
Note
For a description of the following tasks refer to the
chapter "maintenance every 10 operating hours".
Engine oil level, top up if necessary
l
Fuel level, top up if necessary.
l
Hydraulic oil level, top up if necessary.
l
Coolant level, top up if necessary
l
Dry air filter service indicator
l
Water level, top up if necessary.
l
Emulsion level, top up if necessary
l
Air pressure in tires
l
Checking the chip spreader
l
spreading beam
1
Optional equipment
BOMAG
1
and cleaning the
BW 100/120/125 AD-4/AC-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents