Maintenance - Air Techniques MOJAVE LT3 User And Installation Manual

Dry vacuum system
Table of Contents

Advertisement

Warning:
Cleaning agents that contain bleach or foam should not to be used in this system. These
cleaners will leech mercury from amalgam and pollute our environment. Please use non-
foaming, non leaching, and biodegradable CleanStream (PN 57850) for proper cleaning.
Initial Maintenance.
After installation, clean the vacuum lines with CleanStream Cleaner . This is especially necessary when
a new system is being installed into existing dental system piping . Using CleanStream Cleaner helps
the MOJAVE LT3 system to remove any built up deposits in the piping system . Perform the initial
cleaning by performing the daily maintenance procedure provided below .
Maintenance-Free MOJAVE Pumps.
All MOJAVE LT3 pumps are designed for maintenance-free operation . The pump features a powerful
3-phase motor . The motor is completely water and oil-free and provides a dependable operation
requiring no scheduled maintenance .
Preventive Maintenance.
Whenever a service technician fulfills a repair call at the customer site routine checks should also
be performed to detect general overall wear, and replacement of parts should be made if necessary
before a failure causes a prolonged shut-down . This preventive maintenance program will aid in
dependable equipment operation and help reduce breakdown .
Scheduled Maintenance.
Since a well-organized maintenance program aids dependable equipment operation and reduces
breakdown to a minimum, it is essential that the maintenance instructions be followed completely .
The routine cleaning will remove any built up deposits in the piping system .
Daily
1. Clean drain lines from the operatory to the air/water separator with CleanStream Cleaner
by performing the procedure provided on the next page.
Weekly
1. Check for noise and leaks.
2. Clean exterior surfaces
3. Make sure that no flammable, corrosive, or combustible materials are stored in the equipment
room (especially in the area around the equipment).
Monthly
1. Check tubing for kinks or cracks.
2. Check drip leg for liquids on exhaust line.
3. Check for debris in the solids strainer.
Important:
Evidence of buildup at the base drain most likely means that a stricter adherence to
the daily maintenance procedure is required.
Semi-
Check the inlet filter on the pump assembly for buildup. The filter should be dry and clean.
Annually
The presence of any liquid or debris means that the installation is incorrect or there is an issue
with the air/water separator.
Page 22

MAINTENANCE

Air Techniques, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents