Optional Log Set
Log Kit Installation Natural Gas
Log kits used to create sequence shown: 2 LGS58, 1 LGS57, 1LGS59
A
B
Figure 12. LGS57
STEP 1: Place logs A and B from set LGS57 evenly spaced apart
behind the burner. The log placed on the right should be orientated
180° compared to the left log.
A
3
1
2
Figure 12.c LGS58
STEP 2: Place Log 1 behind the burner port next to the right log of
LGS57. Place log 2 on top of log 1
A
2
XG0777 - 180525
LGS57
B
Figure 12.b
LGS58
4
5
1
Figure 12.d
STEP 3: Place log 1 from the second LGS58 kit in front of the ports
left of the log from LGS57.
STEP 4: Take log 3 from each LGS58. place one in front of the ports
near the middle of the appliance, see figure 12f. Place the other in
front of the ports and pilot, see figure 12ff.
B
STEP 5: From LGS58, place log 4 on the left side of the left log from
LGS57. Cross log 4 over the ports. Place log 5 on the right side of the
left log from LGS57. Cross log 5 over the ports. See figure 12g.
6
STEP 6: From LGS58, Place log 4 on the right log from LGS57. Cross
log 4 over the ports. Place log 2 on the right end of the right log from
LGS57, See Figure 12h.
B
B
Installation
A
1
Figure 12.e
3
Figure 12.f
3
Figure 12.ff
4
5
A
Figure 12.g
2
4
Figure 12.h
B
25