Loading - Bunn JDF-4D Installation & Operating Manual

Refresh server plus
Hide thumbs Also See for JDF-4D:
Table of Contents

Advertisement

LOADING THE PRODUCT
ACCESS MENU
• To access the MENU
screen, open the
dispenser door and turn
on the switch at the top
inside of the door.
• Select menu option
using the touch screen.
• To leave MENU screen,
turn off the switch
inside the door.
3.
Insert
connector.
Twist connector ¼
turn clockwise.
8.
When changing
flavors for day
parting, press YES.
RINSING
1. Touch bottom edge of
2. Place a container
flavor label and swipe
up. Rinse nozzles
before removing
containers.
LOADING PRODUCT
• Product should be
refrigerated 24 hours
before loading in
dispenser.
• For detailed
instructions, go to
Training icon.
• Nozzles located in
shipping carton with
product.
4. Open pump lever
and load case into
machine.
9. Swipe UP/DOWN to
new flavor.
3. Press STOP.
under the nozzle
and press START.
1. Load the case with
5. Wrap tubing around
pump.
10. Press SAVE.
9
2. Remove white dust
bag (corner folded).
Close lid.
6. Set nozzle on water
7. Close pump lever.
port tube and snap
in place.
PRODUCT STORAGE
• Always store product
with tube up.
cap.
52959 120717

Advertisement

Table of Contents
loading

Table of Contents