Bunn JDF-4D Installation & Operating Manual page 13

Refresh server plus
Hide thumbs Also See for JDF-4D:
Table of Contents

Advertisement

LEVEL 1 ACCESS (Continued)
DAY PART PRODUCT CHANGE
Open door. Rotate pump lever 90° clockwise.
Disconnect nozzle from water port tube.
Unwrap tubing from pump and remove caddy from
dispenser.
LOADING PRODUCT
• Product should be refrigerated 24 hours before load-
ing in dispenser.
• For detailed instructions, go to Training icon.
• Nozzles are located in shipping carton with product.
2. Load the case with bag (corner folded). Close lid.
4. Wrap tubing around pump.
1. Attach dispense tube to nozzle. Confirm it is fully
seated.
3. Open pump lever and load case into machine.
5. Set nozzle on water port tube and snap in place.
13
52959 082216

Advertisement

Table of Contents
loading

Table of Contents