Daikin RoofPak RPS Series Installation And Maintenance Manual page 32

Roof mounted singlezone heating and cooling units with microtech iii unit controllers
Table of Contents

Advertisement

Figure 47: RPS/RDT Split at Condensing Unit Reassembly, Steps 1–6
NOTE: RFS units with front discharge do NOT include refrigerant piping to the DX coil. Field piping is required.
NOTE: RFS units with front discharge do NOT include refrigerant piping to the DX coil. Field piping is required.
Figure 48: Installing Condenser Support, Step 7
IM 926-3 • ROOFPAK APPLIED SYSTEMS
Step 3: Loosen piping
clamps and move pipes
to prevent piping
Step 1: Remove top cap
interference during
and save for step 10.
reassembly (suction,
liquid, and hot gas
bypass lines).
RFS air
handler unit
Step 2: Remove piping cover
and discard. Reinstall screws
to prevent water leakage.
Step 6: Remove bolt
and save for step 7.
Step 5: After main unit is installed,
remove lifting bracket on both sides
and discard. Save bolts for step 7.
32
Mechanical Installation
RCS
condensing
unit
Step 6: Remove bolt
and save for step 12.
Step 1: Before units are assembled,
remove wire cover and discard.
I n s t a l l c o n d e n s e r s u p p o r t
o n m a i n u n i t a s s h o w n w i t h
b o l t s s a v e d f r o m
s t e p 1 ( t y p .
b o t h s i d e s o f u n i t ) ; f i l l u n u s e d
h o l e s i n u n i t b a s e w i t h b o l t s
s a v e d f r o m
S t e p 1 .