Operation
8.10 Re-commissioning the machine
Other types of construction
In other types of construction, you must blow the coolant out with compressed air.
8.10
Re-commissioning the machine
When you re-commission the machine, proceed as follows:
● Study the record made when the machine was decommissioned, and reverse the measures
● Perform the measures listed in the "Commissioning" section.
See also
Start-up (Page 105)
8.11
Switching on again after an emergency switching-off
● Check the machine before recommissioning the driven machine after an Emergency Off.
● Eliminate all the causes that have led to the emergency off
8.12
faults
8.12.1
Inspections in the event of faults
Natural disasters or unusual operating conditions, such as overloading or short circuit, are
faults that overload the machine electrically or mechanically.
Immediately perform an inspection after such faults.
Correct the cause of the fault as described in the respective remedial measures section. Repair
any damage to the machine.
128
that were taken for conservation and storage.