Grid-Tied Operation - AEG AS-IC01 Installation Instructions Manual

Three-phase grid-tied solar inverter 4 kw to 10 kw
Table of Contents

Advertisement

26
5.
Ensure that the voltage meets the requirement mentioned in section 2.4;
6. Ensure that all electrical safety indications are clearly identifiable at the installation site.

4.2 Grid-tied operation

The following section describes the detailed operation of the inverter, covering the inspection before operation, grid-
tied operation.
Please start the inverter as follows:
1.
Ensure the requirements mentioned in section 4.1 are met;
2.
Switch on the breakers at the AC side;
3.
Switch on the integrated DC switch;
4. Switch on the switch on the DC side;
5.
Observe the LED indicators and information displayed on the screen. Refer to chapter 5 for detailed
information.
Green indicator blinks, others off: the inverter is powered on and in self-inspection; wait for enough light
Run
to fulfill grid-connected condition
Green indicator on, others off: the inverter is generating power after self-inspection;
Run
successful commissioning.
"Warn" or "Fault" indicator is on or flickers: inverter is powered on but system fault occur. Refer to section 5.3 to
check the fault code in LCD display, stop the inverter as per section 4.3, and rule out faults according to chapter
7. After all the faults are removed, repeat the operations in chapter 4.
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
In order to ensure a safe, smooth and stable operation of the PV power generation system,
all the newly installed / renovated / repaired components of the plant and
the grid-connected inverters must undergo inspection before operation start.
When the inverter is powered for the first time, please refer to section 5.5
for grid certification choice. Keep the inverter turned on at least 30 minutes to
allow for charging of the internal clock battery.
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-ic01-2

Table of Contents