AEG AS-IC01 Installation Instructions Manual page 43

Three-phase grid-tied solar inverter 4 kw to 10 kw
Table of Contents

Advertisement

42
Refer to the below table for detailed information.
Inverter control
Control item
On/Off control
Restart
Record clear
Restore to
factory
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
LCD display
O n / O f f C t r l
O N
O F F
R e s t a r t
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
C l e a r a l l R e c o r d : S u r e ?
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
R e s t o r e t o F a c t o r y
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
Table 19: Inverter control
Instruction
Control the "On/Off" function through the panel.
Press " " and " " in the control interface to select the
operation. Press "ENT" to confirm the operation and press
"ESC" to return.
Restart the inverter through the panel. All settings and
operation record will be saved.
Press "ENT" to confirm restarting: the inverter will begin to
self-inspect; or press "ESC" to return.
Press "ENT" to confirm clearing all records or press "ESC" to
return.
"Record clear" clears all setting parameters through the
panel, restores the factory settings and saves all history
operation records.
"Restore to factory" clears all setting parameters and history
operation records through the panel and restores the factory
setting. Press "ENT" to confirm the operation or press "ESC"
to return.
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-ic01-2

Table of Contents