Daikin SWP Series Installation Manual page 7

Self-contained air conditioning systems
Table of Contents

Advertisement

Disassembly
1 . Open the fan section access door and remove any item
placed in the section during shipping .
2 . Open the Control Box doors and remove any item placed
during shipping, such as filter clips and isolation pads.
3 . Review the wiring schematics and wiring connections
inside the control box . Disconnect control and
power connections for the supply fan motor and all
compressors . Control wires are plugged into the Patch
Panel on the right side . Disconnect the tubing on PC5,
PC7 and DHL pressure switches .
4 . Disconnect sensor wires from the control box that go out
to the other sections . Place the wire harnesses in the
section where their respective sensor is located .
5 . The top panel of the Control Panel Box should be
removed to allow two eye bolts with nuts to be installed
and used for rigging . Connect the lifting hooks to the eye
bolts and lift to secure the clamps and provide support
to the Control Box in transition . Remove the steel plates'
screws
(Figure
5); close the panel doors and lift carefully
to remove the section completely (See
NOTE: To remove panels, flat or right angle painted plates;
T-30 TORX drive is required .
Figure 6: Assembled Self-Contained Unit Showing Steel Plate Locations and Type
See
Figure 5
1) Flat Plate
2) Right Angle Plate
2
1
www .DaikinApplied .com
Figure
7) .
2
7
Figure 5: Painted Steel Plates
2
1
IM 1032-2 • Self-Contained Air Conditioning Systems
I
nsTallaTIon
Flat Plate
Right Angle Plate
2
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents