Installation Procedures - ABB Symphony Harmony Series Instruction

Input/output system, i/o and auxiliary blocks
Hide thumbs Also See for Symphony Harmony Series:
Table of Contents

Advertisement

Unpacking and Inspection
7. Do Not Use Lead Pencils to Set Switches
tamination of switch contacts that can result in unnecessary
circuit board malfunction, do not use a lead pencil to set a
switch.
Unpacking and Inspection
1. Examine the hardware immediately to verify that it has not
been damaged in transit.
2. Notify the nearest ABB sales office of any damage.
3. File a claim for any damage with the transportation com-
pany that handled the shipment.
4. Use the original packing material and container to store
the hardware.
5. Store the hardware in an environment of good air quality,
free from temperature and moisture extremes and corrosives.

Installation Procedures

Table
procedures. Refer to
this section for an explanation of how to use the procedure
sections.
Table 5-1. Installation Procedures
Procedure
5 - 2
Do Not Use Lead Pencils to Set Switches. To avoid con-
Do Not Use Lead Pencils to Set Switches
Do Not Use Lead Pencils to Set Switches
5-1
lists all of the I/O and auxiliary block installation
Installation and Connection Sequence
Installation and Connection Sequence
Installation and Connection Sequence
Installation and Connection Sequence
Description
PR1
Installation preparation
PR2
I/O block base installation
PR3
I/O module installation
PR4
Auxiliary block installation
PR5
BLK-100 installation
PR6
AIN-120 setup
PR7
AIN-200 setup
PR8
AIN-220 setup
PR9
AIN-300 setup
PR10
AOT-150 setup
PR11
CIO-100 setup
in