Chapter 4 Installation Of Equipment; General Flow Of Installation Of The Equipment - Olympus OER-Elite Installation Manual

Endoscope reprocessor
Hide thumbs Also See for OER-Elite:
Table of Contents

Advertisement

Chapter 4
4.1

General flow of installation of the equipment

Connect the water supply hose, drain hose and power cord to the equipment, and set up the required
chemicals (disinfectant, detergent etc.).
Be sure to clean the reprocessor before installation, since dust could accumulate on or in the machine
under certain storage or transport conditions. Check that the external surface, bottom surface, and
casters of the equipment are clean before installation.
WARNING
• Make sure to connect the power cord plug to the hospital-grade wall mains power
outlet of your medical facility. Plug the power cord directly into a hospital-grade,
wall mains power outlet and do not use a multiple outlet. This equipment must be
grounded; otherwise, an electric shock or a fire may result.
• Do not allow the power cord plug to get wet. A wet plug could cause an electric
shock.
• To prevent an electric shock, do not touch the power cord plug or directly touch the
power source with wet hands.
• When using disinfectant solution and alcohol, Olympus recommends the use of gas
filters and running this equipment in well-ventilated areas.
 Wear a face mask, gloves, and protective clothes to minimize aspiration and
 Wear goggles for eye protection.
Refer to the following association's guidelines related to ventilation:
If the person operating the equipment exhibits an allergic reaction or symptoms no
matter how slight they should discontinue the task they are performing and vacate
the room.
OER-Elite INSTALLATION MANUAL
Installation of Equipment
skin contact.
SGNA
(Society of Gastroenterology Nurses and Associates)
ASGE
(American Society of Gastroenterological Endoscopy)
APIC
(Association for Professionals of Infection Control and Epidemiology)
AORN
(Association of Preoperative Registered Nurses)
ASTM
(American Society for Testing and Materials)
OSHA
(Occupational Safety and Health Administration)
ACGIH
(American Conference of Governmental Industrial Hygienists)
NIOSH
(National Institute for Occupational Safety and Health)
AIA
(American Institute of Architects)
4.1 General flow of installation of the equipment
Ch.4
49

Advertisement

Table of Contents
loading

Table of Contents