Cisco Nexus 7004 Hardware Installation And Reference Manual page 35

Nexus 7000 series
Table of Contents

Advertisement

Chapter 1
Overview
requirements for this system, see
about preparing the data center for the installation, see the Cisco Nexus 7000 Series Site Preparation
Guide.
Safety Guidelines
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning
Statement 1030
The prerequisites listed for any procedure are required conditions that you must verify before you start
that procedure. If the prerequisites have not been met, you must satisfy those requirements before
carrying out the procedure.
Safety warnings appear in this publication wherever procedures present conditions that could endanger
you or others installing this system. Adhering to these warnings and following their recommended
actions are required actions for these procedures. For regulatory compliance and safety information on
these warnings, see the Cisco Nexus 7000 Series Regulatory Compliance and Safety Information
document.
Installation and Connection Guidelines
After you fully prepare the site as specified in the Cisco Nexus 7000 Series Site Preparation Guide,
install a two-post 19-inch EIA rack for Cisco Nexus 7004 and 7009 chassis or a four-post 19-inch EIA
rack for all chassis. To install the system, you must make sure that you have the proper mounting brackets
(front-mount or center-mount brackets) installed on the chassis, move the chassis to the rack, elevate it
to the lowest possible RU for that chassis, and fasten the chassis to the rack. With the chassis fastened
to the rack, you can ground the chassis, install its cable management frames, install the optional door
and optional air filter, and connect the switch to the console and network. For detailed instructions on
installing a Cisco Nexus 7000 Series switch, see the following chapters:
For detailed instructions on connecting the switch to the console and network, see
"Connecting the Cisco Nexus 7000 Series Switch to the Network."
Do not use the handles on the side of the chassis to lift the Cisco Nexus 7009, 7010, or 7018 chassis or
Caution
a fully loaded Cisco Nexus 7004 chassis (you can use these handles to lift a Cisco Nexus 7004 chassis
if you remove the power supplies so that the chassis weighs less than 120 pounds [52 kg]). For the Cisco
Nexus 7009, 7010, and 7018, use these handles only for adjusting the position of the chassis while the
chassis rests on a platform or bottom-support rails.
OL-23069-07
Chapter 2, "Installing a Cisco Nexus 7004 Chassis"
Chapter 2, "Installing a Cisco Nexus 7004 Chassis"
Chapter 3, "Installing a Cisco Nexus 7009 Chassis"
Chapter 4, "Installing a Cisco Nexus 7010 Chassis"
Chapter 5, "Installing a Cisco Nexus 7018 Chassis"
Chapter 6, "Installing Power Supplies"
Appendix A, "Technical Specifications."
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Safety Guidelines
To see detailed information
Chapter 7,
1-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7010Nexus 7009Nexus 7018

Table of Contents