Louver Installation With Typical Unit Configurations - Daikin AVV Installation And Maintenance Manual

Classroom unit ventilators floor models digital ready, microtec control (“j” vintage) field controls by others
Hide thumbs Also See for AVV:
Table of Contents

Advertisement

Louver Installation With Typical
Unit Configurations
Unit Configuration Type AL
Figure 9: The 16-5/8" (422mm) Deep Unit with Open Pipe
Tunnel and Standard Louver Location
Lintel
(By Others)
Louver
Sealed Cement
Mortar; Pitch Away
From Unit
Figure 10: 16-5/8" (422mm) Deep Unit with Open Pipe
Tunnel & High Louver Application with Chased Wall
Lintel
(By Others)
Louver
Not Less Than
3" (76mm)
Not More Than
21" (533mm)
Sealed Cement
Mortar; Pitch Away
From Unit Provide
Drainage
CAUTION
Accumulated moisture can cause property damage if not properly
drained. Installing contractor must provide such drainage.
IM 817-7
Piping
1"
(25mm)
Floor Line
Important: Gasket sealing surface
is required.
Piping
1"
(25mm)
Floor Line
Important: Gasket sealing surface
is required.
Figure 11: Above Floor Level Outdoor Air Intake Using
Arrangement AV or AL With Accessory Closed Pipe Tunnel
Lintel (By Others)
Insulated Closure
Plate Accessory
Intake Louver
Not Less Than 3"
Not More Than 28"
Provide
Drainage
Sealed Cement Mortar;
Pitch Away From Unit
Figure 12: Floor Level Outdoor Air Intake With Window
Below Unit Top Using Arrangement AL And 9" "Finished"
(Painted) Accessory (Uninsulated) Closed Pipe Tunnel
Painted Insulated Closure Plate Accessory
Sash
Lintel (By Others)
Intake Louver
Sealed Cement
Mortar; Pitch Away
From Unit
8
Piping
Floor Line
1" (25mm)
Important: Gasket sealing
surface is required.
Piping
1"
(25mm)
Floor Line
Important: Gasket sealing surface is
required.
www.DaikinApplied.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

AvsAvbAvr

Table of Contents