Start-Up - Ecoer 2436 Installation Instructions Manual

Inverter split heat pump, up to 20 seer, 2-3-4-5ton capacity, r410a
Hide thumbs Also See for 2436:
Table of Contents

Advertisement

ESI Outdoor Unit Installation Instruction

12. Start-up

Refer to IoT Installation and Warranty Guide by ESS APP, connect the IoT gateway before start-up.
At the same time, ensure chapters 5~11 have been completed.
1. Set the thermostat to OFF.
3. Wait one hour before starting the unit if the
outdoor ambient temperature is below 59 º F.
60 MIN
Note:
It may take up to 45 minutes in the first time for heating operation to exit start-up control. This is normal
function to preheat lubricants in the bottom of compressor.
Manufacturer reserves the right to change specifications or designs without notice.
15/31
2. Turn on disconnect switch to apply power
to the indoor and outdoor units.
4. Set the thermostat to ON.
www.ecoer.com
08.2018

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4860

Table of Contents