Quantum StorNext QD7000 Hardware Manual page 136

Hide thumbs Also See for StorNext QD7000:
Table of Contents

Advertisement

Hardware installation for Synchronous Mirroring and Asynchronous Mirroring | 127
The following figure shows the cabling that is described in Step
page 127.
1.
Host Fibre Channel cable
2.
Storage array Fibre Channel cable
3.
Fibre Channel cable dedicated for mirroring
7. Connect controller port B1 of the primary storage array to an available port in zone 3 of switch 2.
8. Connect controller port A2 of the primary storage array to an available port in zone 2 of switch 1.
In a four-host-port system, connect controller port A4 to an available port in zone 2 of switch 1.
9. Connect controller port B2 of the primary storage array to an available port in zone 4 of switch 2.
In a four-host-port system, connect controller port B4 to an available port in zone 4 of switch 2.
Upon activation of the Synchronous Mirroring feature or the Asynchronous Mirroring
Note:
feature, controller port A2 and controller port B2 are reserved for mirror relationship
synchronization. In a four-host-port system, controller port A4 and controller port B4 are
reserved.
10. Connect controller port A1 of the secondary storage array to an available port in zone 1 of switch
1.
The figure following Step
9
through Step
on page 127.
11. Connect controller port B1 of the secondary storage array to an available port in zone 3 of switch
2.
12. Connect controller port A2 of the secondary storage array to an available port in zone 2 of switch
1. In a four-host-port system, connect controller port A4 to an available port in zone 2 of switch 1.
13. Connect controller port B2 of the secondary storage array to an available port in zone 4 of switch
2. In a four-host-port system, connect controller port B4 to an available port in zone 4 of switch 2.
13
on page 127 shows the cabling described in Step
6
on page 126 through Step
6
on page 126
9
on

Advertisement

Table of Contents
loading

Table of Contents