Reassembling Cover; Applying Power; Checking Network Cabling - Danfoss VLT DeviceNet MCA 104 Installation Manual

Frequency converter, vlt fc 102/202/301/302 series
Hide thumbs Also See for VLT DeviceNet MCA 104:
Table of Contents

Advertisement

Installation
Wiring Procedure for Enclosure Types D, E, and F
1.
Mount the fieldbus connector on the fieldbus
option (terminal V-, CAN_L, Drain, CAN_H, V+).
2.
Prepare the fieldbus cable by stripping a section
of the cable insulation. Keep unshielded wire as
short as possible. For cable specifications, refer to
chapter 3.7.1 Cable Specifications.
3.
Connect the fieldbus cable wires to the terminals
according to the colour code of the wires, see
Illustration 3.8.
4.
Fix the cable screen to the metal base plate using
cable clamp or cable tie, see Illustration 3.12.
5.
Tie down the cable and route it with other
control wires inside the unit, see Illustration 3.12.
Illustration 3.12 Wiring for Enclosure Types D, E, and F
MG33D502
Installation Guide

3.8 Reassembling Cover

1.
2.

3.9 Applying Power

Follow the instructions in the frequency converter
Operating Instructions to commission the frequency
converter. The frequency converter automatically detects
the DeviceNet interface. A new parameter group (Group
10-XX) appears.

3.10 Checking Network Cabling

1.
2.
3.
Danfoss A/S © Rev. 03/2015 All rights reserved.
Mount the new front cover and the LCP.
Attach the sticker with the correct product name
to the front cover.
If the address has not been set via the address
switches, go to parameter 10-02 MAC ID to set the
address.
Connect to a running DeviceNet master.
Check that network cabling is correct or not.
3
3
11

Advertisement

Table of Contents
loading

Table of Contents