Download Print this page

NTI WF200 Installation And Operation Manual page 5

Wood fired boiler

Advertisement

WF200
Table 3-1 Minimum Clearances for Installation and Service
Clearances
Minimum
Recommended
Notes:
1
Space above boiler shall NOT be used for storage.
2
With hot water coil installed, the coil side requires a minimum of 24 in. clearance.
24" or 6"
1
Front
Top
48 in.
6 in.
60 in.
36 in.
Figure 3-1 Minimum Clearances to Combustibles
6"
24"
Installation and Operation Manual
Dimensions
2
Sides
Rear
6 in.
24 in.
24 in.
36 in.
18"
6"
48"
Flue Pipe
18 in.
18 in.
5

Advertisement

loading