3
Parts Replacement and Cleaning Procedure > Removing the Buffer Pass > Removing the Lower Cover
Removing the Upper Cover
Preparation
1) Remove the Buffer Pass Unit from the host machine.
Procedure
1) Remove the Upper Cover.
• 2 Screws (Binding) [1]
• 4 Claws [2]
• 1 Boss [3]
[1]
x2
x4
[2]
3
Parts Replacement and Cleaning Procedure > Removing the Buffer Pass > Removing the Lower Cover
[2]
[1]
[3]
F-3-11
Removing the Lower Cover
Preparation
1) Remove the Buffer Pass Unit from the host machine.
2) Remove the Upper Cover.
Procedure
1) Disconnect the connector [1], and free the harness from the Wire Saddle [2].
2) Free the harness from the Wire Saddle [1] and the guide.
3-5
[2]
[1]
F-3-12
[1]
F-3-13
3-5