Quadivator ST50 Assembly/Operators/Parts Manual page 5

Snow thrower 50" width
Table of Contents

Advertisement

Pre-Delivery Check List
Check off all items as they are found satisfactory or after adjustments
are made:
1 All safety shields and guard are securely in place!
1 All decals are in place and readable!
1 Tighten all hardware – see Checking Bolt Torque in Service Section.
1 Check the drive belt is adjusted properly – see Service Section.
CAUTION
1Start the Quadivator Snow Thrower and allow it to run for 5 – 10 minutes, check
for excessive operation or unusual noise.
1The Quadivator Snow Thrower has been tested and to the best of my
knowledge, is ready to be delivered to the customer!
Date Predelivered –
Signature –
To help prevent personal injury
from rotating impeller or thrown
objects, never walk or stand in line
with the discharge during run-in or
operation!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents