Summary of Contents for HighPoint Thunderbolt TurboBox NA211TB
Page 2
Thunderbolt PCIe Expansion Enclosure Overview Installation of PCIe Add-on Cards in 1. Power--on indicator LE NA211TB This power-on indicator LED only shows the status of power. Based on the most up-to-date Thunderbolt technology and When TurboBox is powered on, it shows blue.
Page 3
2. The NA211TB is designed to be powered on and 4. Verify the PCIe cards installed inside NA211TB. powered off simultaneously with HOST when TurboBox After seeing information on HighPoint Thunderbolt target NA211TB is connected to HOST by Thunderbolt cable.
Need help?
Do you have a question about the Thunderbolt TurboBox NA211TB and is the answer not in the manual?
Questions and answers