3-6
Board Transfer Test
After adjusting the board rail width and support pins, carry out the board transfer test and check
that the board is transferred smoothly.
Actually the transfer test of whole line is carried out. This section describes the
board on the rear conveyor of pre-station, after the transfer test to the pre-station.
SERVO
OFF (
3Y3C-EEn-Main-001
To the next page
293C-E-EMA03-A01-02
NOTICE
) ON (
)
1
. Turn on the servo switch.
2
. Press
.
Product
config
• The production setting screen appears.
UNLOCK
3
. Press
and PCB transfer .
• The board transfer screen appears.
3
Page 3-11