Section 8 Establishing Connection And Verifying The Iec 61850 Communication; Overview; Setting The Station Communication - ABB RER670 Commissioning Manual

Relion 670 series, railway application version 2.2 iec
Hide thumbs Also See for RER670:
Table of Contents

Advertisement

1MRK 506 377-UEN C
Establishing connection and verifying the IEC 61850 communication
Section 8
8.1
8.2
Railway application RER670 2.2 IEC
Commissioning manual
Establishing connection and verifying the
IEC 61850 communication

Overview

The rear optical Ethernet ports are used for:
process bus (IEC/UCA 61850-9-2LE) communication
substation bus (IEC 61850-8-1) communication

Setting the station communication

To enable IEC 61850 communication, the corresponding ports must be activated.
The rear access points can be used for IEC 61850-8-1 and IEC/UCA 61850-9-2LE
communication. IEC 61850-8-1 redundant communication requires the use of two
Ethernet ports, when it is activated for Ethernet port the next immediate port is
selected as the second Ethernet port and will become hidden.
When configuring RER670 for 9-2LE streams in a 16,7Hz system,
the IED shall be set to 16,7Hz and the MU to 50Hz (4kHz
sampling).
To enable IEC 61850 station communication:
In this example access points 1, 2 and 3 are used.
1.
Activate IEC 61850-8-1 (substation bus) communication.
Navigate to: Main menu/Configuration/Communication/Station
communication/IEC61850–8–1/IEC61850–8–1:1
2.
Enable operation for Access Point 1 and 3 in the Ethernet configuration tool
(ECT) in PCM600.
3.
Enable redundant communication for Acess point 1 using ECT.
4.
Enable IEC/UCA 61850-9-2LE (process bus) communication for Access
point 3 by connecting it to a Merging unit in the Merging units tab in ECT.
Section 8
SEMOD172103-4 v9
SEMOD172108-3 v14
57

Advertisement

Table of Contents
loading

Table of Contents