Section 10
Testing functionality by secondary injection
10.12.8
10.12.8.1
10.12.8.2
176

Voltage harmonic monitoring VHMMHAN

Prepare the IED for verification of settings outlined in Section
to verify
settings".

Verifying the signals and settings

The voltage can be injected using common test equipment.
Verifying the warning and alarm time limit of
tDelayAlmTHD
1.
Supply the IED with voltage at rated value.
2.
Apply harmonics at the numerical multiple of fundamental frequency along
with the injected voltage signal.
3.
Slowly increase the harmonic amplitudes until the THDWRN signal appears.
4.
Compare the harmonic amplitude level value with the set warning limit value.
5.
Continue to inject the same level of harmonics level until the THDALM
signal appears and note down the time from THDWRN set to THDALM set.
6.
Compare the noted time value with the set time limit value of alarm.
Verifying the warning and alarm time limit of individual harmonic
IHD , WrnLimit#HD and tDelayAlm#HD (where # = 2
distortions
rd
th
3
...5
)
1.
Supply the IED with voltage at rated value.
2.
nd
Apply 2
order harmonic along with injected voltage signal.
3.
Slowly increase the harmonic amplitude until the 2NDHDWRN signal
appears.
4.
Compare the harmonic amplitude level value with the set warning limit value.
5.
Continue to inject the same level of harmonics level until the 2NDHDALM
signal appears and note down the time from 2NDHDWRN signal set to
2NDHDALM signal set.
6.
Compare the noted time value with the set time limit value of alarm.
7.
Repeat Steps
2
to
6

Completing the test

Continue to test another function or end the test by changing the TestMode setting
to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.
for the harmonics until 5
1MRK 506 377-UEN C
GUID-C4E8C37F-0266-44DA-B292-3565C5BD49D0 v1
GUID-804F309E-B02F-4F6B-B0FC-2C7AE3F12DBA v1
"Preparing the IED
GUID-1A5BBF82-94AE-4E87-B951-CA007CC36CF1 v1
THD , WrnLimitTHD and
GUID-3E56D8AC-9461-4EEA-83A8-522CA177563E v1
GUID-17EC5D60-A748-46F4-8F13-A77E9CA3D17D v2
th
order.
GUID-EDB51B29-9556-4EF4-94E6-5DC6B8C0F13A v1
Railway application RER670 2.2 IEC
Commissioning manual