Monogram ZVB36 Installation Instructions Manual page 18

Downdraft vent system 36" wide; 36" wide
Hide thumbs Also See for ZVB36:
Table of Contents

Advertisement

1
Step
(continued)
2
• Determine location of the blower and
Step
Determine
Blower
• Secure mounting brackets to the top of the
Location
• Mark the installation location and cut hole
• Secure the blower to the joists.
18
• Remove the 4 nuts holding the blower to the
mounting plate. One nut is hidden inside
the outlet. Remove blower.
• Remove the blower mounting plate.
• Remove 2 screws along the bottom of the
blower box which are visible once blower
plate is removed.
• Carefully, turn the unit over to access the
back side.
• Remove 4 screws along the top of the blower
box.
• Turn unit over and remove the 4 screws
along the top.
• Remove the blower box.
• Retain all screws.
motor.
– The blower will fit between floor joists, 16"
on center. Or, provide a surface to attach
the entire assembly to the underside of the
floor.
blower with screws and nuts. One bracket in
each corner, as illustrated.
– Set the bracket at the ends of the curved
slots to reach a 14-1/2" span between floor
joists, or adjust for your installation
situation.
for 6" round duct.
JXRB57 Kit
For Indoor Remote Blower Locations
Important: Save any
unused parts. If the
appliance is relocated at
a later time, parts may be
needed.
Hidden
Screws
Blower
14-1/2"
Blower Box
Blower
Mounting
Plate

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZVB36 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Zvb30Jxbc57

Table of Contents