Mira 415 Installation And User Manual page 19

Pressure balanced shower control
Hide thumbs Also See for 415:
Table of Contents

Advertisement

5.
Make good the wall surface. Fit the pipework concealing plates over the hot
and cold water supply pipework.
6.
Fit the gaskets to the
tapered ends outermost to accept the compression fittings. Tighten the
connector nipples fully with a 12mm A/F hexagon wrench (not supplied).
7.
Thoroughly flush the incoming hot and cold water supply pipes before
connecting the shower control (Byelaw 55). Failure to do so may result in a
product malfunction.
8.
Slip the compression nuts and olives over the supply pipes.
9.
Locate the shower control body onto the backplate and inlet supply pipework,
then secure by tightening, clockwise, the two recessed grub screws, using the
2.5 mm A/F hexagon wrench (supplied).
10. Tighten the compression nuts, using if necessary, a cloth to protect the plated
surfaces.
11. Turn on the water supplies and check for any leaks!
/
" BSP connector nipples and screw in the nipples with the
1
2
Fibre Gasket
19
Connector Nipple
/
" BSP
1
2

Advertisement

Table of Contents
loading

Table of Contents