Texas Instruments MRD2EVM User Manual
Texas Instruments MRD2EVM User Manual

Texas Instruments MRD2EVM User Manual

Microreader evaluation kit

Advertisement

Quick Links

MRD2EVM Microreader Evaluation Kit
User's Guide
Literature Number: SCBU050
July 2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MRD2EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments MRD2EVM

  • Page 1 MRD2EVM Microreader Evaluation Kit User's Guide Literature Number: SCBU050 July 2012...
  • Page 2: Table Of Contents

    Demo 7: HDX+ Transponders (Inventory Command) – Tab 3 ......Demo 8: PaLFI (Read, Write, Battery Charge and Check, and Flash LED) – Tab 4 ........................Schematics ................... RI-STU-MRD2 EVM Board Table of Contents SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 3 List of Figures ....................RI-STU-MRD2 EVM Board ................... MRD2EVM Carton Box With Contents ......................Windows Security ....................Driver Installed Successfully .................... New Hardware Wizard, Step 1 .................... New Hardware Wizard, Step 2 .................... New Hardware Wizard, Step 3 ....................
  • Page 4: Microreader Overview

    USB connector. The RI-STU-MRD2 is backward compatible with the RS232 based RI- STU-MRD1 reader module. Figure 1. RI-STU-MRD2 EVM Board MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 5: Kit Contents

    Low-power operation (2.7 V to 5.5 V) • Supports programming and tuning of advanced transponders • Easy to design in and use Kit Contents Figure 2. MRD2EVM Carton Box With Contents Table 1. Kit Contents Order or Specification Ref Des Part Type Number...
  • Page 6: Download The Software

    Figure 4. Driver Installed Successfully 6. The USB driver is now installed on the PC, and the system is ready for use. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 7: New Hardware Wizard, Step

    Figure 6 is displayed, click "Install from a list or Specific location" and then click Next. Figure 6. New Hardware Wizard, Step 2 SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 8: New Hardware Wizard, Step

    Figure 8. New Hardware Wizard, Step 4 5. The USB driver is now installed on the PC, and the system is ready to use. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 9: Ri-Stu-Mrd2 Demo Software (Gui) Installation

    COM Port data with version Tab 1 Tab 2 Tab 3 Tab 4 Tab 5 Figure 9. RI-STU-MRD2 Demo Software (GUI): Startup Screen SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 10: Demo Examples

    Uncheck the Calc CRC box to write 10-byte data (the CRC is not calculated by the reader). Shows the last 20 commands transmitted to reader. Shows the last 20 commands received from reader. Continuous mode operation check box. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 11: Demo 2: Read Or Write Lf Transponder (Mpt 16/17) - Tab 1

    Uncheck this box and click Write Tag to write only the edited page data. If the data has not been edited, then reader writes the default page 1 data as shown in Figure SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 12: Demo 3: Hdx+ Transponder (Read Or Write Memory) - Tab 1

    This is the last column of the grid view table that shows the memory status of each page. The locked pages with orange background are not re-writable. The writable pages with green background are re-writable. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 13: Demo 4: Otp Transponder (Read Or Write Id) - Tab 2

    4 needs to be checked to load the subsequent ID from the Excel spreadsheet after each successful write to the transponder. Click Unload XLS to remove the loaded data. SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 14: Demo 5: Hdx+ Transponder (Read Or Write Id) - Tab 2

    5 needs to be checked to load the subsequent ID from the Excel® spreadsheet after each successful write to the transponder. Click Unload XLS to remove the loaded data. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 15: Demo 6: Hdx+ Transponder (Trim Frequency) - Tab 2

    20 mm to 40 mm to measure and program the correct frequency. The resulting frequency might vary ±500 Hz due to the limited resolution of the internal tuning circuit. Status message field. SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 16: Demo 7: Hdx+ Transponders (Inventory Command) - Tab 3

    IDs. A double click on any of ID data in the table initiates a read of the memory content of the selected transponder. MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 17: Demo 8: Palfi (Read, Write, Battery Charge And Check, And Flash Led) - Tab 4

    Flash LED: Selection of the LED color in the field. A click on the flash LED button initiates the corresponding LED to blink on PaLFI tag which is providing an example for an MSP access command to the PaLFI tag. SCBU050 – July 2012 MRD2EVM Microreader Evaluation Kit Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 18: Schematics

    Schematics www.ti.com Schematics RI-STU-MRD2 EVM Board Figure 18. RI-STU-MRD2 EVM Board Schematic MRD2EVM Microreader Evaluation Kit SCBU050 – July 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 19 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 20 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjuku-ku, Tokyo, Japan...
  • Page 21 This development kit is NOT certified as Confirming to Technical Regulations of Radio Law of Japan http://www.tij.co.jp 【ご使用にあたっての注】 本開発キットは技術基準適合証明を受けておりません。 本製品のご使用に際しては、電波法遵守のため、以下のいずれかの措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。    上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・インスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル http://www.tij.co.jp EVALUATION BOARD/KIT/MODULE (EVM) WARNINGS, RESTRICTIONS AND DISCLAIMERS For Feasibility Evaluation Only, in Laboratory/Development Environments. Unless otherwise indicated, this EVM is not a finished electrical equipment and not intended for consumer use.
  • Page 22 Any other use and/or application are strictly prohibited by Texas Instruments. If you are not suitable qualified, you should immediately stop further use of the TI HV EVM.

Table of Contents