Installing The 14U Chassis Mid-Mount Rack Kit For Two-Post Racks (Xbr-Dcx-0121) - Brocade Communications Systems X6-8 Hardware Installation Manual

Director
Table of Contents

Advertisement

6.
Fasten the port side of the device to the rack rails. Use three 10-32 x 5/8 inch (1.58 cm) screws per rail. Tighten the screws to
a torque of 32 in-lb (37 cm-kg). Refer to
NOTE
Do not use the top or bottom holes of the mounting bracket because the screw heads will interfere with the door.
FIGURE 8 Attaching port side of device to rack rails
1.
10-32 x 5/8 in. (1.58 cm) panhead Phillips screw with washer
7.
Reinstall the device door if removed from your device. For instructions, refer to the door removal and replacement procedures in
your device installation guide.
Installing the 14U Chassis Mid-Mount Rack Kit for
Two-Post Racks (XBR-DCX-0121)
Use the following instructions to install a Brocade modular device in a telecommunications (Telco) rack, using the 14U Chassis Mid-
Mount Rack Kit for Two-Post Racks (XBR-DCX-0121).
Brocade X6-8 Director Hardware Installation Guide
53-1004105-07

Installing the 14U Chassis Mid-Mount Rack Kit for Two-Post Racks (XBR-DCX-0121)

Figure
8.
39

Advertisement

Table of Contents
loading

Table of Contents