Wiring the GRAFIK Eye QS with DALI

Line Voltage Wiring Details

• Use properly certified cable for all line voltage/mains cables.
• Proper short-circuit and overload protection must be provided at the distribution panel.
• Install in accordance with all local and national electrical codes.
• IEC PELV terminals may be temporarily unplugged for ease of IR, occupancy sensor, and control wiring.
Step 1: Install wallbox
• Mount a 89 mm deep, 4-gang U.S.
wallbox onto a dry, flat, indoor surface
that is accessible and allows for system
programming and operation.
• Allow at least 110 mm clearance above
and below the faceplate to ensure
proper heat dissipation. Allow 25 mm for
faceplate overhang on all sides.
Allow 25 mm clearance on all sides
110 mm
Note: 4-gang wallbox available from
Lutron: P/N 241400.
®
Step 2: Check control unit wiring
WARNING! Shock hazard. May
result in serious injury or death.
Always turn off circuit breaker or
remove main fuse from power line
before doing any work. Before
connecting the loads to the GRAFIK
Eye QS with DALI
the loads for short-circuits.
• Earth/ground terminal connection must
be made as shown in line voltage wiring
diagrams.
• Follow all local and national electrical
codes when installing IEC PELV wiring with
line voltage/mains wiring.
LUTRON
Notice: Risk of damage to unit.
• Do not connect line voltage/mains cable to IEC PELV terminals.
• Do not install control units to dim re cep ta cles, mo tor-operated ap pli ances, or
LUTRON
fluorescent lighting not equipped with DALI
DALI
®
• Control units are de signed for res i den tial and commercial use, for indoor use only.
• Control units must be in stalled by a qual i fied electrician in accordance with all
applicable regulations and building codes.
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS with DALI
Control Unit:
control unit, test
®
devices approved for your location.
Control Unit Quick Installation and Operation Guide
®
Step 3: Connect line voltage and loads
to control unit
• Strip 8 mm of insulation off the line
voltage/mains cables in the wallbox.
8 mm
• Connect the line voltage/mains, ground,
and load wires to the appropriate terminals
on the back of the control unit.
L: Line / Hot
N: Neutral
: Ground
The recommended installation torque is
0.6 N∙m.
electronic dimming ballasts, or other
®