Installing/Removing the Server into/from the Rack
3rd-Party Rack
Certain boundary conditions are to be fulfilled:
– Installation dimensions (see the dimensions shown in
1
rack front side
2
rack rear side
A
rack depth (comparison PRIMECENTER Rack 940/1000 mm)
B
rack width (comparison PRIMECENTER Rack 700 mm)
C
clearance of the 19-inch installation level
C1
front 19-inch installation level
C2
rear 19-inch installation level
D
area for cable routing (cable area depth) and ventilation
E
area for front panel and ventilation
F
right and left area for support systems
P
PRIMERGY installation depth
a1
front left support upright
a2
front right support upright
b1
rear left support upright
b2
rear right support upright
– The operability of the safety mechanisms at the server e.g. stoppers or
holding back systems must be guaranteed.
– The form of the rack support uprights must ensure the frontal screwing on of
the rails.
– Frontally bolted telescopic rails.
The rails are provided with a linear alignment possibility to ensure also an
adjustment to different rack depths.
– No support of the cable management (delivered with the mounting kit).
– Climatic conditions.
For the ventilation of the installed server a large extent unhindered air intake
in the rack front and air discharge in the rear cover of the rack are necessary.
36
Operating manual
Hardware Installation
figure 4 on page
37).
RX300 S3

Advertisement