AAON V3-A Installation, Operation & Maintenance Instructions Manual page 81

V3 series vertical indoor air handling units
Table of Contents

Advertisement

Water/Glycol System
1. Has the entire system been flushed and pressure checked?
2. Has the entire system been filled with fluid?
3. Has air been bled from the heat exchangers and piping?
4. Is the glycol the proper type and concentration (N/A if water)?
5. Is there a minimum load of 50% of the design load?
6. Has the water piping been insulated?
7. What is the freeze point of the glycol (N/A if water)?
______________________________
Electric Heating
Stages__________
Stage
1
2
3
4
Gas Heating
Natural Gas
Stage
Manifold Pressure ("wc)
1
2
Limit Lockout
Amps
Propane
Purge Air from Lines
Aux. Limit Lockout
Stage
5
6
7
8
Verify Pilot Spark
Stage
Manifold Pressure ("wc)
3
4
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Amps
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V3-bV3-cV3-eV3-d

Table of Contents