Installing The Remote Thermostat In The Environment; Filling The Heating System - Moretti Design AQUA User Manual

Hydro stove
Table of Contents

Advertisement

CHIMNEY FLUE THROUGH OUTSIDE WALL
CORRECT
INSTALLATION
PROTECTION
CAP
INSULATED
CHIMNEY
FLUE
INSULATED
"T" WITH
INSPECTION
CAP
"T" WITH
INSPECTION
CAP
INTERNAL CHIMNEY FLUE
CORRECT
INSTALLATION
PROTECTION
CAP
INSULATED
CHIMNEY
FLUE
CHIMNEY
FLUE
"T" WITH
INSPECTION
CAP
"T" WITH
INSPECTION CAP
CHIMNEY
FLUE
EXTERNAL FREE CHIMNEY FLUE
IMPROPER
INSTALLATION
Warning:
The chimney must be constructed according to regulation
standards.
For an external installation, use an insulated chimney flue that can
be inspected on the curves
Use only stainless steel tubes.
Do not use synthetic materials or aluminium.
All sections of the fume exhaust must be accessible for inspections
and internal cleaning.
The minimum draft at nominal power must be 10 Pa, the minimum
draft at reduced power must be 5 Pa.
The outdoor section of the barrel must be insulated.
Failure to comply with the above will void the warranty.

Installing the remote thermostat in the environment

Moretti Design hydro stoves allow for the installation of a on/off remote
thermostat. The connection for the remote thermostat is located on the
back of the stove straight under the power connector, it has a two pin
connector coupling with two buttons, one black and one red. The
connection to the thermostat assures the function that the boiler stove
can go into Modulation.

Filling the heating system

Before installing the hydro stove it is recommended to carefully wash out
all the tubes of the system in order to remove any debris that may affect
the proper function of the appliance.
Once all plumbing connections have been completed, the system must
be filled with water. Open all vents. Open the filling valve and check for
any leaks. Close the tap and the vent valves. Start the pump several
times to remove any eventual air pockets.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents