Installation - Mira Sprint 7.5 Installation, Operation, Maintenance Manual

Electric showers
Table of Contents

Advertisement

Section
8
1. Mira Sprint
WARNING! Isolate the electrical and water supplies before proceeding with the installation
of the Mira Sprint.
Note! An installation template is supplied to help you install the Mira Sprint.
1.1. Decide on a suitable position for the Mira Sprint (minimum distance of 200 mm
from the ceiling to allow for cover fit and removal). The position of the Mira Sprint
and the shower fittings must provide a minimum gap of 25 mm between the spill-
over level of the shower tray/bath and the handset. This is to prevent
backsiphonage (refer to Figure 1, Section 7).
1.2. Remove the three cover retaining screws.
1.3. Remove the cover.
1.4. Remove the service tunnel.
1.5. Determine the direction of the inlet water supply: top (falling), bottom (rising),
or back inlet .
Note! Make sure that the back inlet does not go directly back into the wall.
Use a soldered elbow
1.6. Swivel the inlet connector assembly to suit. Remove the inlet blanking cap.
Avoid trapping the green earth bonding wire.
1.7. Remove as appropriate, the thinned sections of the Mira Sprint case, to allow the
supplies to enter the product.
1.8. Thoroughly flush the mains-fed cold water supply pipe. The supply must
be clean and free from debris BEFORE connecting the Mira Sprint.
1.9. An installation template is supplied to help you install the Mira Sprint.
Put the installation template on the wall and mark through the positions of the
fixing holes. Make sure that sufficient electrical supply cable is available for
connection to the terminal block.
14

Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprint 9.5Sprint 8.5

Table of Contents