Mira Sprint 7.5 Installation, Operation, Maintenance Manual page 24

Electric showers
Table of Contents

Advertisement

3.8. Remove the heater tank and the inlet connector assembly from the flow valve and
switch assembly.
3.9. Remove the microswitches from the flow valve and switch assembly.
3.10. Make a note of the positions of the solenoid wires on top of the heater tank.
Remove the solenoid wires.
3.11. Remove the flow valve and switch assembly.
3.12. Refit the components in reverse order. Make sure that the electrical wires are
installed in the correct positions.
Terminal Block
Inlet Supply
Pipe
Inlet Connector
Flow Valve and Switch Assembly - Removal and Installation
24
Microswitch
Clamp Bracket
Clamp Bracket
Retaining Screws
Splash Guard
Flow Valve and
Switch Assembly
Heater Tank
Microswitch
Heater Tank
Retaining Screws
Outlet Connector

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprint 9.5Sprint 8.5

Table of Contents