1.12. Make the connection to the mains-fed cold water supply pipe.
1.13. Bring the electrical supply cable into the case through one of the cable entry
points.
1.14. Strip back sufficient of the outer cable insulation to enable routing to terminal
block.
1.15. Fit an earth sleeve to the earth conductor. Connect the conductors firmly into
the terminal block. Make sure that the bare cores of each conductor are
securely trapped within each conductor clamp.
L = Red wire
N = Black wire
E = Yellow/Green sleeved wire.
1.16. Re-tighten the terminal block screws.
1.17. If necessary, fit an earth bonding clamp to the copper supply pipe and ensure
bonding in compliance with BS7671 (IEE Regs).
1.18. Refit the cover. Fit and tighten the three cover retaining screws.
1.19. Fit the shower fittings. Refer to seperate instructions.