HELIOS COMBO SPH3600/5000-BL

1.2 Operation Requirements

The operation and wiring for device should be performed by qualified person, which is to ensure that
the electrical connection meets the related standards.
Don't perform maintenance until disconnecting AC gird, AC load, DC input and battery input with
inverter and wait for 5 minutes to discharge completely.
Before attempting to install, operate and maintain device, the operator must understand the safety
announcements, know correct operations and be trained strictly.
⚫ Operator should know the structure and working principle of PV grid-connected generation
system well.
⚫ Operator must be familiar with the related country and district standard.

1.3 Operation Environment Requirements

The operation environment may influence the life span and reliability of device. So, please avoid to
use device in following environment:
⚫ The place where temperature and humidity beyond the technical specifications.
⚫ The place with vibration or impact.