HELIOS COMBO SPH3600/5000-BL
Don't perform maintenance until disconnecting AC gird, AC load, DC input and battery input with
inverter and wait for 5 minutes to discharge completely.
Please get ready the following information in advance before contacting with us.
Serial number of inverter.
1.
Distributor.
2.
Grid-connected date.
3.
Fault description(i.e. alarm information, indicator status, running information, etc.).
4.
Your detailed contact information.
5.
39
6 Maintenance and Troubleshooting